Approval Status:
Partially approved. Phases 1 and 2 are approved, while Phases 3 and 4 are unapproved. Phase 2 is technically approved, but final approval is pending
Total Area:
346.9 kanals in Phase 1 and 2054.28 kanals in Phase 2
Management:
New Lahore City is a Private housing scheme developed by the Zaitoon Group
(Mian Ayaz Anwar and Mian Ijaz Anwar). The system of management is Owners management. The Supervising Authority is the LDA.
Location:
Main Boulevard, New Lahore City Phase II, Canal Bank Road, Lahore, Pakistan. The overall area/town name is Mauza Sultanki Lahore
View on Maps
Amenities:
- Electricity: Available
- Water: Available
- Gas: Not Available
- Internet: Available
- Private Security: Available
Facilities
The main boulevard is 150 feet wide. Other roads are 35 feet wide.
• Public parks present in society and nearby. Public parks are available within the society.
• Entry to society is permitted for outsiders. The society is a Gated Community with two entrances on Sundar Road and one on Canal Road.
Plots:
| Unit |
Prices (Year 2025) |
| 5 Marla |
25 lacs – 38 lacs (Phase 3), 32 lacs – 45 lacs (Phase 2) |
Approach Road:
Approach roads are constructed and well maintained, providing access through Sundar Road and Canal Road. The society is located near NH-5 and the M2 interchange. Public transport access is available.
Surroundings:
Bahria Town is a neighboring housing project
Area Livability:
Education: Schools are available, including Cornerstone and Dar e Arqam.
- Parks and Recreation: Public parks are available. Communal activities like clubs, gyms, or libraries are not available.
- Shopping and Dining: Shopping facilities are available. Fri-chicks is a famous brand available.
- Other Amenities: Basic amenities are available, including Allied bank, Faisal Bank, and J.S Bank. A mosque is operational. Security is available 24/7.
Opinion:
New Lahore City offers moderate livability, providing essential services like electricity, water, internet, schools, and security, making it suitable for lower middle class to middle class residents. However, the absence of gas and the partial approval status (with Phases 3 and 4 unapproved) introduce risk. The society is substantially developed and populated in its approved phases (Phases 1 and 2 are more than 50% populated).
If you want more information, check out our Housing Society Report with additional details at ________
Website https://zaitoon.com.pk/new-lahore-city/
Disclaimer:
All this information includes but is not limited to information from the society’s website. In addition
to the website, information was collected from government websites, through market research and survey visits by
GEP team to verify and enrich available information.